FAQ
We do not accept returns on sheds that have been treated with any type of chemical wood preservative or paint.
Returns can only be made if your shed is in the same condition as when it was originally delivered.
We recommend that your base should be exactly the same size as your shed, this will ensure that water drains freely from the roof preventing pooling underneath.
Yes. We offer 12 months guarantee, will endeavour to rectify problems you may encounter with your shed.
A set of treated bearers will prevent the base of the shed coming in contact with the ground and allow air to flow underneath.
These can ONLY be used on hard level ground.
Soft unlevel ground? Contact our sales team to discuss other options.
No. All of our standard sheds are constructed from quality sustainably sourced timber.
All our panels are nailed together during manufacture.
Sheds are assembled with screws and trims secured with nails
Does not present a serious danger if it gets shattered
*There is and additional £7.00 per window to the base price of the shed. It can be chosen as an option on your shed order.
Recommended in areas where children will be playing
(Please note that safety glass comes as a standard on playhouses.)
Gives the shed extra strength and durability.
Standard framing uprights are 11/2″x 11/2″ (38mmx38mm approx.)
Heavy duty framing uprights are 2″x2″ (51mmx51mm approx.)
Pricing
Price will depend on the size of your shed.
Recommended
Ideally for large sheds or where shelving is going to be installed.
We use a dip-treament process to protect your shed. This gives the shed a golden brown colour.
Treatment is carried out at our factory, so it is important to stipulate a preference when ordering your shed.
We offer either-
full treatment: includes both the inside and outside of the panels and base
base only treatment
Key Benefit
Treatment will significantly increase the life of your shed.
Pricing
Price will depend on the size of your shed and the options that you choose.
Recommended
We recommend that you at least have the base treated, as you will not be able to treat it once the shed is erected.
Yes, We aim to deliver and install standard sheds on the same day.
Assembly typically takes 1-2 hours.
No, if access to the site is available we can have your shed assembled and ready for your return.
We offer several options for groundworks
- Groundscrews with timber frame base.
- Concrete slab
- Timber frame base (hard ground only)
Contact the sales team to discuss options
We can build bespoke! If the size you need is not listed contact our sale team to discuss your requirements.